List of Proposed Projects

SULPHUR HIGH - MAIN CAMPUS
New Construction
- New Music Building to Be Constructed on the South Side of Ash Street
- New Covered Walkways with Waiting Shelters at Ash Street and Willow Avenue Connecting the High School and the New Music Building to the Ninth-Grade Campus
- Extension of the Bus Canopy
Major Renovations
- Renovation of the Vocational Building #5 to Additional Classrooms (12) Once the Band, Chorus, and Welding Moves to New Locations
- Renovation of the Southern Part of the South Building #3, Adding Covered Walk, Elevator, and Restrooms Along with Demolition of the Older Northern (16 Classroom) Part of the Two Story 1940s Building to Free Up Campus Space for Long Range Needs
- Renovation of Building #1 to Result in Additional Classrooms (4)
- Renovation of the Auditorium in Central Building #4 with New Seating and Sound System
- Renovation of the Gym Building #6
Minor Renovations
- New Interior Finishes as Required
- New Flooring
- New Doors and Hardware
- New LED Lighting in Classrooms
- Replace Identified HVAC Systems
Additional Work
- Life Safety Improvements
- Building Code Upgrades
- Security Upgrades
- Fire Alarm and Intercom Upgrades
- Upgrades To Electrical Power and Data Systems
- Miscellaneous Plumbing Upgrades and Replacements
- Football Stadium Improvements, Drainage, Parking Renovations, and Partial Turf Replacement

 

 

SULPHUR HIGH - 9TH GRADE
New Construction
- New Covered Walkway from Commons Area to Shelter
- New Waiting Shelters at Willow Avenue
- New Covered Walkway from Building to Pods
Major Renovations
- New Bleachers and Sound System at Gym
Minor Renovations
- Replace Kitchen Flooring
- Upgrade Stair Finishes
- Replace Identified Doors, Frames, and Hardware
- Replace Carpet
Additional Work
- Site Drainage
- Lighting in Parking Lots
- Exhaust Fans in Restrooms
- Electrical Gear